- City/Country: Ashanti, Ghana
- Completion:
- Business area: Industrial Machinery
- Type: Mining, Hoisting & Transportation
- Infobox
Client: Ashanti Goldfields
- description
Design, manufacture, supply and supervision of installation of a new double drum winding engine for access to a shaft some 1,562m below ground.
The men/material winder consisted of a 5.5m double drum winder operating on a cage/counterweight system with automatic and manual controls.
Power was provided from a 1,702KW direct coupled motor. The loose drum operated through a multi-tooth clutch which slides on the drumshaft splines to engage or dis-engage the loose drum during level changes.
You are here
Subnavigation
Kwesi Mensah Shaft No.2
back to list
