business area

type

  • Mechanical Handling
  • Environmental Technologies
  • Marine and Coastal Engineering
  • Swing Bridges
  • Plate Forming & Bending
  • Manufacturing
  • Mining, Hoisting & Transportation
  • Cruise Liner
  • Opera House
  • Concert Hall
  • Multifunctional Hall/Stadium
  • Theatre
  • Steel composite girder
  • Bascule Bridges
  • Pipeline Bridges
  • Panel Bridges
  • Emergency Bridges
  • Floating Bridges
  • Fly-over Ramp
  • Truss Bridges
  • Free form structures
  • Envelopes & Facades
  • Canopies
  • Cable structures
  • Suspension Bridges
  • Mobile Construction
  • Arch Bridges
  • Plate-girder Bridges
  • Cable-stayed Bridges
  • Modular Bridges

continent

period

reset all

Hull Marina

  • City/Country: Kingston upon Hull, United Kingdom
  • Completion:
  • Business area: Industrial Machinery
  • Type: Mechanical Handling
  • Infobox

    Client: Hull City Council

  • description

    Waagner-Biro's subsidiary Qualter, Hall was commissioned to refurbish the inner pair of lock sector gates and provide a new electrical control system for the complete lock.

    The scope of works included:

    • Remove inner pair of lock gates
    • New surface treatment of the gates
    • Replacement of all seals
    • Refurbishment of all winch drives
    • Supply all new electrical equipment and cabling to operate full lock with new PLC control
    • Re-installation of gates and equipment, and commissioning 

back to list